Yamaha S12 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Zusätzliche Musikausrüstung Yamaha S12 herunter. Yamaha S12 User's Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - GEO S12 Series

GEO S12 Series Geo S1210 & Geo S1230 Tangent Array Modules LS18 & LS18e Subwoofer User Manual GEO S12 Series User Manual V1.05

Seite 2

Page 10/103 INTRODUCTION  NS-1 simulation software assists in the design and implementation of vertical tangent GEO arrays. Please

Seite 3 - BASIC PRECAUTIONS

Page 100/103 GEO S12 SERIES PARTS & ACCESSORIES LIST MODEL DRAWING DESCRIPTION VNT-XHBRK Lifting Ring for GPT-SSBRK or GPT-PSBRK or GPT

Seite 4

GEO S12 SERIES PARTS & ACCESSORIES LIST Page 101/103 MODEL DRAWING DESCRIPTION VNI- LBRK “L” Bracket for cable suspension (for fixed instal

Seite 5 - HIGH SOUND PRESSURE LEVELS

Page 102/103 USER NOTES 13 USER NOTES

Seite 6 - CONTENTS

USER NOTES Page 103/103 France Nexo S.A. Parc d’activité de la dame jeanne F-60128 PLAILLY Tel: +33 3 44 99 00 70 Fax: +33 3 44 99 00 30 E-m

Seite 7 - CONTENTS Page 7/103

GEO S12 GENERAL SET-UP INSTRUCTIONS Page 11/103 2 GEO S12 GENERAL SET-UP INSTRUCTIONS 2.1 Speaker connection GEO S12 and LS18 is connected wit

Seite 8 - 1 INTRODUCTION

Page 12/103 GEO S12 GENERAL SET-UP INSTRUCTIONS 2.1.4 Cabling NEXO recommends the exclusive use of multi-conductor cables to connect the sy

Seite 9 - NTRODUCTION Page 9/103

GEO S12 GENERAL SET-UP INSTRUCTIONS Page 13/103 CONNECTOR PANEL PASSIVE MODE ACTIVE MODE B A D C

Seite 10 - NTRODUCTION

Page 14/103 AMPLIFIER SELECTION FOR USE WITH GEO S12 & LS18 3 AMPLIFIER SELECTION FOR USE WITH GEO S12 & LS18 3.1 GEO S12, LS18 an

Seite 11 - 2.1 Speaker connection

GEO S12 SETUPS ON NEXO TD CONTROLLERS Page 15/103 4 GEO S12 SETUPS ON NEXO TD CONTROLLERS 4.1 NXAMP TDControllers As of today, load 3.15 featu

Seite 12

Page 16/103 CONNECTION DIAGRAMS 5 CONNECTION DIAGRAMS 5.1 GEO S12 / NXAMP4x1 (Bridge Stereo – S12 in Passive mode)

Seite 13

CONNECTION DIAGRAMS Page 17/103 5.2 GEO S12 / NXAMP4x1 (Bridge Stereo – S12 in Active mode)

Seite 14 - 3.1.1 NXAMP connectors

Page 18/103 CONNECTION DIAGRAMS 5.3 LS18 / NXAMP4x1 (Bridge Stereo)

Seite 15 - 4.1 NXAMP TDControllers

CONNECTION DIAGRAMS Page 19/103 5.4 LS18 & Geo S12 / NXAMP4x1 (Bridge Stereo – S12 in Passive mode)

Seite 16 - 5 CONNECTION DIAGRAMS

Page 2/103 PLEASE READ CAREFULLY BEFORE PROCEEDING GEO Technology is radically new thinking The GEO R&D Project has, to date, resulted i

Seite 17

Page 20/103 CONNECTION DIAGRAMS 5.5 GEO S12 / NXAMP4x4 (4 Channels – S12 in Passive mode)

Seite 18 - ONNECTION DIAGRAMS

CONNECTION DIAGRAMS Page 21/103 5.6 GEO S12 / NXAMP4x4 (S12 in Stereo Active mode)

Seite 19

Page 22/103 CONNECTION DIAGRAMS 5.7 LS18 / NXAMP4x4 (4 channels)

Seite 20

CONNECTION DIAGRAMS Page 23/103 5.8 LS18 & GEO S12 NXAMP4x4 (S12 in Passive Mode)

Seite 21

Page 24/103 NS-1 SIMULATION SOFTWARE 6 NS-1 SIMULATION SOFTWARE NS-1 software is a R&D simulation tool derived application. It processe

Seite 22

CONFIGURABLE DIRECTIVITY DEVICE Page 25/103 7 CONFIGURABLE DIRECTIVITY DEVICE The GEO Wavesource controls dispersion of acoustic energy using a

Seite 23

Page 26/103 CONFIGURABLE DIRECTIVITY DEVICE 7.2 When & where to use Configurable Directivity flanges The diagrams show audience area co

Seite 24 - 6 NS-1 SIMULATION SOFTWARE

GEO S12 HARDWARE SETUP PROCEDURE Page 27/103 8 GEO S12 HARDWARE SETUP PROCEDURE Before proceeding with assembly of GEO S12 & LS18 arrays, p

Seite 25

Page 28/103 GEO S12 HARDWARE SETUP PROCEDURE  When deploying a GEO S12 & LS18 system always wear protective headwear, footwear and eye

Seite 26

GEO S12 HARDWARE SETUP PROCEDURE Page 29/103  Never allow anyone, whether operators, artists or members of the public to climb onto a ground s

Seite 27 - 8.1 SAFETY FIRST

PLEASE READ CAREFULLY BEFORE PROCEEDING Page 3/103 PLEASE READ CAREFULLY BEFORE PROCEEDING BASIC PRECAUTIONS Do not open the speaker s

Seite 28

Page 30/103 GEO S12 HARDWARE SETUP PROCEDURE 8.2 General Description GEO S1230 GEO S1210 GEO S1230,

Seite 29 - 8.1.3 Contacts

GEO S12 HARDWARE SETUP PROCEDURE Page 31/103 8.2.1 Described configurations FIXED INSTALLATIONS TOURING APP

Seite 30 - 8.2 General Description

Page 32/103 GEO S12 HARDWARE SETUP PROCEDURE 8.2.2 WARNINGS ON GEO S12 ACCESSORIES WARNING 1 All GEO S12 & LS18 Accessories are

Seite 31

GEO S12 HARDWARE SETUP PROCEDURE Page 33/103 8.3 GEO S12 in fixed installations 8.3.1 Fixed installation Accessories and kits Accessories are:

Seite 32

Page 34/103 GEO S12 HARDWARE SETUP PROCEDURE 8.3.2 Single GEO S12 rigidly mounted on a wall or a ceiling (vertical or horizontal) Required

Seite 33

GEO S12 HARDWARE SETUP PROCEDURE Page 35/103 8.3.3 Single GEO S12 cable mounted on a wall or a ceiling (vertical or horizontal) Required items

Seite 34

Page 36/103 GEO S12 HARDWARE SETUP PROCEDURE 8.3.4 GEO S12 vertical array rigidly mounted on a ceiling Required items  1 x VNI-BUMPER (a

Seite 35

GEO S12 HARDWARE SETUP PROCEDURE Page 37/103        (9) Apply Loctite 243 or equivalent to four shoulder screws from the

Seite 36

Page 38/103 GEO S12 HARDWARE SETUP PROCEDURE 8.3.5 LS18 & GEO S12 vertical array rigidly mounted on a ceiling Required items  1 x VN

Seite 37

GEO S12 HARDWARE SETUP PROCEDURE Page 39/103  (5) Apply Loctite 243 or equivalent to the screws that attach the LS18 connector plate to th

Seite 38

Page 4/103 PLEASE READ CAREFULLY BEFORE PROCEEDING SAFETY INSTRUCTIONS FOR NEXO TD CONTROLLERS NEXO ANALOGUE PSTDCONTROLLERS, NX242 DIG

Seite 39

Page 40/103 GEO S12 HARDWARE SETUP PROCEDURE  (11) Flip cluster by 90° so that it is ready to be positioned under the ceiling

Seite 40

GEO S12 HARDWARE SETUP PROCEDURE Page 41/103 8.3.6 LS18 and GEO S12 vertical array cable mounted on a ceiling Required items  As in 2 sectio

Seite 41

Page 42/103 GEO S12 HARDWARE SETUP PROCEDURE 8.3.7 GEO S12 horizontal array rigidly mounted on a ceiling Required items  2 x VNI-ABRK (al

Seite 42

GEO S12 HARDWARE SETUP PROCEDURE Page 43/103  (7) Flip the cluster upside down to access connector plates located on the down side;  (8) Rep

Seite 43

Page 44/103 GEO S12 HARDWARE SETUP PROCEDURE 8.3.8 GEO S12 horizontal array cable mounted on a ceiling Required items  2 x VNI-LBRK (all

Seite 44

GEO S12 HARDWARE SETUP PROCEDURE Page 45/103 8.4 GEO S12 in touring applications 8.4.1 Touring Accessories Accessories are :  Bumper (GPT-BU

Seite 45 - 8.4.1 Touring Accessories

Page 46/103 GEO S12 HARDWARE SETUP PROCEDURE 8.4.2 Single GEO S12 on speaker stand or on LS18 horizontally Required items  1 x “U” Bracke

Seite 46

GEO S12 HARDWARE SETUP PROCEDURE Page 47/103

Seite 47

Page 48/103 GEO S12 HARDWARE SETUP PROCEDURE 8.4.3 Single GEO S12 flown vertically Required items  1 x Flying Bar for single vertical GEO

Seite 48

GEO S12 HARDWARE SETUP PROCEDURE Page 49/103 8.4.4 Single GEO S12 flown horizontally Required items  1 x “U” Bracket for single horizontal GE

Seite 49

PLEASE READ CAREFULLY BEFORE PROCEEDING Page 5/103 HIGH SOUND PRESSURE LEVELS Exposure to extremely high noise levels may cause permane

Seite 50

Page 50/103 GEO S12 HARDWARE SETUP PROCEDURE 8.4.5 Two GEO S12 on wind-up stand Required items  1 x U” Bracket for two GEO S12 (GPT-PSBRK

Seite 51

GEO S12 HARDWARE SETUP PROCEDURE Page 51/103

Seite 52 - IMPORTANT

Page 52/103 GEO S12 HARDWARE SETUP PROCEDURE Alternative Procedure (“Walder” procedure) Below described procedure required 2 additional 8x20

Seite 53

GEO S12 HARDWARE SETUP PROCEDURE Page 53/103

Seite 54

Page 54/103 GEO S12 HARDWARE SETUP PROCEDURE 8.4.6 Two GEO S12 flown horizontally Required items  1 x “U” Bracket for two GEO S12s (GPT-P

Seite 55

GEO S12 HARDWARE SETUP PROCEDURE Page 55/103 8.4.7 Two or more GEO S12 flown vertically Required items  N Pair of Rigging Plates (GPT-XBOW) f

Seite 56

Page 56/103 GEO S12 HARDWARE SETUP PROCEDURE IMPORTANT GEO S12 can be flown “Up” or “Down”: - “Up” means Nexo logo on front grid is at the t

Seite 57

GEO S12 HARDWARE SETUP PROCEDURE Page 57/103  Lift and position assembly, connect lifting rings to suspension points

Seite 58

Page 58/103 GEO S12 HARDWARE SETUP PROCEDURE 8.4.8 LS18 and three or more GEO S12 flown horizontally Required items  1 x Bumper (GPT-BU

Seite 59

GEO S12 HARDWARE SETUP PROCEDURE Page 59/103 Optional GPT-TLB link bar for GPT- XBOW GPT-XBOWs are delivered with standard link bars whic

Seite 60 - Procedure

Page 6/103 CONTENTS CONTENTS PLEASE READ CAREFULLY BEFORE PROCEEDING ...

Seite 61

Page 60/103 GEO S12 HARDWARE SETUP PROCEDURE Procedure  Insert LST-XBOW into connecting plates of both sides of LS18s;  Insert GPT-XBOW

Seite 62

GEO S12 HARDWARE SETUP PROCEDURE Page 61/103 IMPORTANT GEO S12 can be flown “Left” or “Right” : - “Left” means Nexo logo on front grid is left a

Seite 63 - GPT- XBOW STANDARD LINK BAR

Page 62/103 GEO S12 HARDWARE SETUP PROCEDURE IMPORTANT Ensure angle settings are identical on both sides of the cabinets. Ensure that sa

Seite 64

GEO S12 HARDWARE SETUP PROCEDURE Page 63/103 8.4.9 Ground stacked LS18 and GEO S1210 Required items  M pairs of rigging plates (LST-XBOW) for

Seite 65

Page 64/103 GEO S12 HARDWARE SETUP PROCEDURE LS18 and GEO S12 ground stack device description GPT-GSTK ground stack device includes:  two

Seite 66

GEO S12 HARDWARE SETUP PROCEDURE Page 65/103  Insert GPT-XBOW into connecting plates of both sides GEO S12s;  Insert LST-XBOW into connect

Seite 67 - GEO S12

Page 66/103 GEO S12 HARDWARE SETUP PROCEDURE  Connect bottom LS18 or GEO S12 to GPT-GSTK Ground stacking device with 4 8x20 quick release

Seite 68

GEO S12 HARDWARE SETUP PROCEDURE Page 67/103  Once the assembly is completed, rotate rear or front GEO S12 ground stack device adjusta

Seite 69 - YSTEM ALIGNMENT GUIDELINES

Page 68/103 GEO S12 HARDWARE SETUP PROCEDURE 8.5 Testing and Maintenance of the system  General: Geo is a precision piece of equip

Seite 70 - Precautions & Checks

SYSTEM ALIGNMENT GUIDELINES Page 69/103 9 SYSTEM ALIGNMENT GUIDELINES The NX242’s factory delay presets are optimised to provide the best possi

Seite 71

CONTENTS Page 7/103 8.4.4 Single GEO S12 flown horizontally ...

Seite 72

Page 70/103 SYSTEM ALIGNMENT GUIDELINES 9.3 Driving the LS18s from the AUX send It is quite common to use the AUX send of a mixing desk to

Seite 73 - ECHNICAL SPECIFICATIONS

SYSTEM ALIGNMENT GUIDELINES Page 71/103 9.4 Recommended installation tools and equipment  Tape measure – should be 30m/100ft in length and be

Seite 74 - 11.1.2 Dimensions

Page 72/103 GEO S12 – LS18S SYSTEM CHECK LIST 10 GEO S12 – LS18S SYSTEM CHECK LIST It is essential to execute all these check steps prior t

Seite 75 - 11.2 GEO S1230 Module

TECHNICAL SPECIFICATIONS Page 73/103 11 TECHNICAL SPECIFICATIONS 11.1 LS18 Subwoofer 11.1.1 System specifications SYSTEM SPECIFICATIONS LS1

Seite 76 - 11.2.3 Diagrams

Page 74/103 TECHNICAL SPECIFICATIONS 11.1.2 Dimensions

Seite 77 - 11.3 GEO S1210 Module

TECHNICAL SPECIFICATIONS Page 75/103 11.2 GEO S1230 Module 11.2.1 System specifications PRODUCT FEATURES GEO S1230 Components HF: 1 x 3” voic

Seite 78 - 11.3.3 Diagrams

Page 76/103 TECHNICAL SPECIFICATIONS 11.2.2 Dimensions 11.2.3 Diagrams

Seite 79 - Dimensions

TECHNICAL SPECIFICATIONS Page 77/103 11.3 GEO S1210 Module 11.3.1 System specifications PRODUCT FEATURES GEO S1210 Components HF: 1 x 3” voic

Seite 80 - 11.4.2 LS18 Rigging Plates

Page 78/103 TECHNICAL SPECIFICATIONS 11.3.2 Dimensions 11.3.3 Diagrams

Seite 81 - Weight (pair)

TECHNICAL SPECIFICATIONS Page 79/103 11.4 GEO S12 Touring Applications Accessories 11.4.1 GPT- BUMPER Parts Dimensions

Seite 82

Page 8/103 INTRODUCTION 1 INTRODUCTION Thank you for selecting a NEXO GEO S12 Series Tangent Array System. This manual is intended to

Seite 83 - Weight (kit)

Page 80/103 TECHNICAL SPECIFICATIONS 11.4.2 LS18 Rigging Plates Parts Dimensions

Seite 84

TECHNICAL SPECIFICATIONS Page 81/103 11.4.3 GEO S12 Rigging Plates Parts Dimensions Weight (pair) 10.7 kg / 23.6 Lbs

Seite 85

Page 82/103 TECHNICAL SPECIFICATIONS 11.4.4 Tension Mode Link Bars for GPT-XBOW Parts Dimensions Weight (pair) 0.6 kg / 1.3 Lbs

Seite 86

TECHNICAL SPECIFICATIONS Page 83/103 11.4.5 Lifting Ring Parts Dimensions Weight (kit) 0.3 kg / 0.661 Lbs

Seite 87

Page 84/103 TECHNICAL SPECIFICATIONS 11.4.6 Truss hook for GPT-PSBRK or GPT-SSBRK Parts Dimensions Weight (kit) 0.620 kg / 1.37 Lbs

Seite 88

TECHNICAL SPECIFICATIONS Page 85/103 11.4.7 Truss hook for single vertical GEO S12 Parts Dimensions Weight (kit) 0.7 kg / 1.54 Lbs

Seite 89

Page 86/103 TECHNICAL SPECIFICATIONS 11.4.8 “U” Bracket for single vertical GEO S12 Parts Dimensions Weight (kit) 7 kg / 15.4 Lbs

Seite 90

TECHNICAL SPECIFICATIONS Page 87/103 11.4.9 U” Bracket for two vertical GEO S12 Parts Dimensions Weight (kit) 10.4 kg / 22.9 Lbs

Seite 91

Page 88/103 TECHNICAL SPECIFICATIONS 11.4.10 Ground Stacking Device for up to 6 GEO S1210 Parts 04GPT-GSTK Dimensi

Seite 92

TECHNICAL SPECIFICATIONS Page 89/103 11.5 GEO S12 Fixed Installations Accessories 11.5.1 LS18 & GEO S12 Bumper (VNI-BUMPER) Parts Dime

Seite 93

INTRODUCTION Page 9/103  GEO S12 Accessory Range. a full range of accessories that provides safe, flexible and simple means of installing Ge

Seite 94

Page 90/103 TECHNICAL SPECIFICATIONS 11.5.2 LS18 Counter Plate (LSI-CPLA) Parts Dimensions

Seite 95

TECHNICAL SPECIFICATIONS Page 91/103 11.5.3 GEO S12 Counter Plate (VNI-CPLA) Parts

Seite 96

Page 92/103 TECHNICAL SPECIFICATIONS 11.5.4 LS18 & GEO S12 Connecting Plate 1 (VNI-ANPL1) Parts Dimensions Weight (kit) 7.5 kg

Seite 97

TECHNICAL SPECIFICATIONS Page 93/103 11.5.5 GEO S12 Connecting Plate 2 (VNI-ANPL2) Parts Dimensions Weight (kit) 6.2 kg / 13.7 Lbs

Seite 98

Page 94/103 TECHNICAL SPECIFICATIONS 11.5.6 GEO S12 Connecting Plate 3 (VNI-ANPL3) Parts Dimensions Weight (kit) 5.5 kg / 12.1 Lbs

Seite 99

TECHNICAL SPECIFICATIONS Page 95/103 11.5.7 Single GEO S12 “U” Bracket Parts Dimensions Weight 2.9 kg / 6.4 Lbs

Seite 100

Page 96/103 TECHNICAL SPECIFICATIONS 11.5.8 “L” Bracket for cable suspension Parts Dimensions Weight (kit) 1.75 kg / 3.86 Lbs

Seite 101

TECHNICAL SPECIFICATIONS Page 97/103 11.5.9 “U” Bracket for rigid suspension Parts Dimensions Weight (kit) 1.75 kg / 3.86 Lbs

Seite 102 - 13 USER NOTES

Page 98/103 TECHNICAL SPECIFICATIONS 11.5.10 GEO S12 Push-Pins (04VXT-BL820) 04VX

Seite 103 - NOTES Page 103/103

GEO S12 SERIES PARTS & ACCESSORIES LIST Page 99/103 12 GEO S12 SERIES PARTS & ACCESSORIES LIST 12.1 Modules & Control Electronics

Kommentare zu diesen Handbüchern

Keine Kommentare